SWPPPBinder
Required before breaking ground on sites disturbing 1+ acre

Your construction SWPPP binder, ready in about 30 minutes

Built for excavation & grading contractors and the engineers they work with. Answer plain-English jobsite questions, upload your site plan PDF, and download a complete binder built on the official EPA 2022 CGP SWPPP template — editable Word file plus a bookmarked PDF.

Download Sample .docx

Unedited output from our engine for a fictional 2.5-acre site in Manchester, NH.

Flat Price
$299 / site

One-time, no subscription required

Official Structure
58 Tables

EPA 2022 CGP template, filled from your answers

You Receive
.docx + .pdf

Site plan merged as Appendix II

Free Permit Checker

Coverage trigger, NOI fee & wait before digging

No sign-up
Result SWPPP REQUIRED
Est. NOI Filing Fee
$0 (EPA NeT)
Wait Before Digging
14 Calendar Days
Inspection Schedule
Every 7 calendar days (or 14 days + within 24h of ≥0.25" rain)

Free to start — you only pay ($299) after your binder passes the readiness check. Results are estimates; confirm with your permitting authority.

Official EPA template
2022 CGP SWPPP structure, all 8 sections
Rules as tested code
No AI deciding permit requirements
Secure checkout by Stripe
Card details never touch our servers
Private file storage
Download links expire after 15 minutes

How It Works

Three steps from jobsite details to a printable binder for the site trailer.

1

Answer jobsite questions

Acreage, receiving water, grading phases, operators and inspector — in plain English, about 15 minutes.

2

Upload your site plan PDF

Use the drawing from your civil engineer. A readiness check flags anything missing before you pay.

3

Review, sign & print

Download the editable .docx and bookmarked .pdf, review it, sign Section 8, and keep it on site.

No AI on compliance logic

Every permit rule runs as fixed, tested code

Coverage triggers (1+ acre or common plan), state NOI fees and pre-dig waits, EPA seasonally dry periods by ZIP code (Table 32), the 7-day inspection requirement for impaired or Tier 2+ waters (Table 47), and the N/A gates for sediment basins, chemical treatment, dewatering and turbidity monitoring are all decided by rule code with automated tests — the same inputs always produce the same binder. You still review and sign every page before filing.

Download Editable Sample (.docx)

What's Inside Your 8-Section Binder

Follows the structure of EPA's official 2022 CGP SWPPP template (CGP Part 7).

Section 1
Stormwater Team & Operators

Primary operator, subcontractors, 24-hour emergency contact and qualified inspector training.

Section 2
Site Evaluation & Waters

Coordinates, receiving waters, impaired/TMDL/Tier status, disturbed acreage and construction phases.

Section 3
ESA & Historic Properties

Endangered Species Act criterion selection, historic property screening and SDWA underground injection gates.

Section 4
Erosion & Sediment Controls

Natural buffers, perimeter controls, track-out, inlet protection, dewatering and site stabilization.

Section 5
Pollution Prevention

Fueling, concrete washout, material and waste storage, spill response and sanitary waste.

Section 6
Inspections & Corrective Action

7-day or 14-day + rain-event schedule, impaired-water escalation and delegation of authority.

Sections 7–8
Turbidity & Certification

Turbidity benchmark monitoring when it applies, and the CGP certification signature block.

Appendices
Site Plan, Letters & Logs

Your site plan PDF merged with bookmarks, delegation letter, amendment and grading logs, blank inspection forms.

Which Approach Fits Your Project?

All three are legitimate ways to meet the permit. The right one depends on your site and your team.

Do It In-House

EPA's Free Word Template

$0 • staff time

A good fit when someone on your team knows the CGP well and has time to complete the template's tables, look up dry-period months, and assemble the appendices.

  • Same official EPA structure
  • Full control over every word
  • Appendices and site plan merged by hand
Best for: teams with in-house compliance staff
Guided & Automated

SWPPPBinder

$299 • about 30 minutes

A good fit for typical commercial and residential sites where you already have a site plan PDF and want the template completed and assembled consistently.

  • EPA / FL / MI rules and dry-period ZIP lookup built in
  • Editable .docx and merged, bookmarked .pdf
  • Readiness check before you pay
Full-Service

Engineering / SWPPP Consultant

Custom quote

The right choice when your project needs original erosion-control design, sediment basin modeling, a PE/CPESC/QSD stamp, or someone to represent you with the agency.

  • Site-specific design and drawings
  • Professional stamp where required
  • On-site support and agency coordination
Best for: large, complex or stamp-required sites

Working with an engineer already? Many teams use both: the engineer produces the site plan, and SWPPPBinder assembles it into the completed EPA template.

Simple, Transparent Pricing

Pay per jobsite. Add inspection logging only if you want it.

SWPPP Binder

Per jobsite
$299 one-time
  • EPA 2022 CGP template completed as Word (.docx) + PDF
  • Your site plan PDF merged as Appendix II, with bookmarks
  • State NOI fee and pre-dig wait check
  • Delegation letter, amendment log and blank inspection forms

Inspection & Amendment Plan

Optional add-on
$49 / month
  • Routine and rain-event inspection log
  • Corrective action tracking
  • Cloud archive of binders and inspections
  • Cancel anytime from your account

Payments processed securely by Stripe. Prices in USD.

Frequently Asked Questions

Is this a substitute for an engineer or a PE stamp?

No. SWPPPBinder completes and assembles the SWPPP document. If your state, county or city requires an engineer-designed erosion plan or a professional stamp, you still need one — upload that plan and we merge it into the binder.

Who is responsible for the content?

The permit operator. The binder is built from the information you enter, so review every section, make any site-specific edits in the Word file, and sign the Section 8 certification before you file your NOI.

What if I disturb less than 1 acre?

If your lot is part of a larger common plan of development (such as a subdivision or commercial park) that disturbs 1 acre or more in total, permit coverage and a SWPPP are generally still required before you start.

Which states do you support?

Sites covered by the EPA 2022 Construction General Permit (New Hampshire, Massachusetts, New Mexico, DC, Puerto Rico and other EPA-administered areas), plus Florida (FDEP) and Michigan (EGLE). See the EPA, Florida and Michigan pages.

Can I edit the Word document after downloading?

Yes. The .docx is unlocked, so you can amend it as the project changes. You also get the merged, bookmarked PDF for printing.

What happens to my project data and files?

Your answers and uploaded PDFs are stored privately and used only to build your binder. Files are served through download links that expire after 15 minutes. We never see your card details — Stripe handles payment. See our Privacy Policy.

Why does having a SWPPP matter?

Construction sites covered by a stormwater permit must prepare a SWPPP before submitting the NOI and keep it on site. Clean Water Act civil penalties are inflation-adjusted each year and can exceed $68,000 per day per violation (40 CFR Part 19).